Skip to content
Jewel of Muscat Logo
  • Home
  • Jewel on film
  • The Jewel book
  • The route
  • The story
  • The timeline
  • The 3D model
  • Image gallery
  • Ship’s logs
  • Education
  • Background
  • Speeches
  • Comments
  • English
  • العربية

Testing

001   Testing the ship model
002   Anti-fouling agents are tested
003   A water box for rope testing
004   Coarse rope used for stitching
005   Fine rope used in the rope
006   Beach at Qantab
007   A close up of the model's oars
008   Mixing the putty
009   Checking the test ropes
010   Lime for making paste
011   Mixing up the water-proofing paste
012   Resin used for water-proofing
013   Making the model
014   Sewing rope between the planks
015   Putty for plugging the holes
016   Stitching rope between planks
017   Ropes ready to be placed in water boxes
018   Coir for the rope
019   Putty being applied to the wood to make it water-tight
020   Testing the planks
Toggle Sliding Bar Area