Skip to content
Jewel of Muscat Logo
  • Home
  • Jewel on film
  • The Jewel book
  • The route
  • The story
  • The timeline
  • The 3D model
  • Image gallery
  • Ship’s logs
  • Education
  • Background
  • Speeches
  • Comments
  • English
  • العربية

Fitting out

061   It's heated and stirred into a smooth paste
062   It has to be applied by hand to fill every hole.
063   You need gloves because the mixture is hot at first
064   Abdul Jabbar checks everything is covered
065   Everyone joins in to get the job done
066   Everything below the waterline must be covered
067   The chunam protects the planks and stitching from tiny sea creatures
068   Ayaz Al Zadjali leads the Omani trainees
069   And the Jewel's Captain Saleh Al Jabri helps too
070   When anti-fouling is finished the ship will be ready for its masts.
071   At the shipyard, the spars made from Indian Poona wood take shape.
072   Masts and spars shaped and ready to fit
073   Shaping the masts and spars needs traditional and modern tools
074   On the Jewel of Muscat even the toilets are sewn!
075   The irrepressible Abdul Jabbar
076   The ship's toilets are called 'zoolies'
077   Master Rigger Hussain works with Tom Vosmer on the ship's rigging.
078   Combining thinner and thicker rope makes it smoother and stronger
079   Raju Valap works on shaping rigging blocks
080   Each solid block will be a smooth running pulley
◄1234567►
Toggle Sliding Bar Area