Skip to content
Jewel of Muscat Logo
  • Home
  • Jewel on film
  • The Jewel book
  • The route
  • The story
  • The timeline
  • The 3D model
  • Image gallery
  • Ship’s logs
  • Education
  • Background
  • Speeches
  • Comments
  • English
  • العربية

The voyage – 2nd leg

101   The machine speeds up the work
102   One mast begins to take shape
103   Pushpadas Elamassery enjoys a fresh coconut break.
104   Hand shaping of the masts begins.
105   Tuanie Ismail works on the main mast.
106   Destination Galle  - the masts are loaded up for transport south
107   It's a long drive to Galle but soon the masts will be fitted
108   A great day's work from the whole team
109   Loading fresh water into the hold of the Jewel of Muscat
110   A crane unloads the new masts at Jewel's berth
111   Babu Shankaran and Tom Vosmer working on the new masts
112   Ahmed Al Adawy makes sure a drifting sailboat doesn't collide with the Jewel
113   Drenched by rain, crew members work to pull the drifting sailboat away
114   The Al Khairat Mosque in Galle
115   Captain Saleh Al Jabri presents copies of the Holy Koran to the muezzin of the Al Khairat Mosque
116   Captain Saleh, Said Al Tarshi, and Ahmed Al Balushi with Koranic school students
117   Removing the main mast
118   The old main mast is lowered to the quayside
119   It takes a tall crane to lift a 17-metre mast
120   Removing the mizzen mast
◄1234567►
Toggle Sliding Bar Area