Skip to content
Jewel of Muscat Logo
  • Home
  • Jewel on film
  • The Jewel book
  • The route
  • The story
  • The timeline
  • The 3D model
  • Image gallery
  • Ship’s logs
  • Education
  • Background
  • Speeches
  • Comments
  • English
  • العربية

Construction

041   9 strakes have been fitted
042   President of Singapore launches website
043   A storm wrecks the canopy above the ship
044   Work to clear the wrecked canopy begins
045   The shipyard is reconstructed after the storm
046   Work on the ship picks up pace after the storm
047   Inside the hull
048   HE Abd al-Aziz signs the visitorsÛª book
049   Construction Director, Tom Vosmer, shows Jewel of Muscat to HE Abd al-Aziz and Sayyid Badr
050   HE Abd al-Aziz and Sayyid Badr visit Jewel of Muscat construction site
051   HE Abd al-Aziz sees the sewing process first hand
052   Jewel of Muscat starts to take shape
053   Measuring inside the hull
054   Many planks have been sewn now
055   Sewing the sails
056   Detail of sewing the sails
057   Bending the planks
058   More and more planks are stitched on
059   Inside Jewel of Muscat
060   Jewel of Muscat from above
◄1234568910►
Toggle Sliding Bar Area